Fire Escape Platform Rebuild

Job Description

After a lorry had reversed into this platform, MIRO were commissioned to rebuild it. A cast was made, filled with concrete and left to set. Once set, render was applied to smooth off the edges and the metal rails reattached. The after photo below was before a full repaint was undertaken. 

Before

IMG_1621.JPG

After 

49a65c40-c191-4649-86a0-cab887e533a7.jpg

Concrete Ramp Repair & Safe Tread Tile Installation

Job Description

 Cracks were appearing within the concrete ramp and all of the safe tread tiles were damaged, both creating a hazard for the general public. MIRO were commissioned to repair the ramp and replace all of the safe tread tiles.

Before

f7b17714-abf8-4fd5-81ac-97d80481203c.jpg

After 

IMG_1065.jpg

Barrier Installations

Job Description

MIRO have undertaken numerous installations, including ARMCO, handrail, lamppost barrier, bollard and height restricted barriers.

IMG_2809.jpg
IMG_2808.jpg
IMG_1557.JPG
IMG_4687.jpg
IMG_0008.JPG
IMG_0143.JPG